Balfour Beatty VINCI is proud to be designing and building a 90KM stretch of the West Midlands section of HS2. We currently have an exciting opportunity to join our team as a Interface Engineer (Route wide Buildings) on a three month fixed term contract within the Route wide team.
This role will be based on site in locations around Kingsbury and Lichfield Northern most section of IPT Area North with 16.3km of rural high-speed line to the east of Lichfield and runs North of Curdworth for approximately 13km, through a mainly rural landscape between Sutton Coldfield and Tamworth finishing at Rookery Wood.
Role description:
To ensure that all interfaces are effectively processed to achieve project objectives and control risks associated to those interfaces.
Experienced required
- Engineering Degree holder.
- Experience in the construction industry.
- Experience in delivering multi-discipline projects.
- Proven experience in interface management.
- Experience in railway transport systems engineering is recommended.
- Thorough knowledge of delivering multi-discipline turn-key projects.
Please note candidates will need to have a current valid right to work in the UK to be considered for this role
Benefits of working with us
- Flexible working
- Remote working
- Enhanced maternity and paternity
- Access to Employee Assistant programmes
- Annual flu vaccinations
- Healthcare
- Excellent pension contributions
- Travel allowance for eligible candidates
About Balfour Beatty VINCI
Working together for over 30 years, Balfour Beatty VINCI have been successful in delivering several significant infrastructures; creating unrivalled expertise and capability across rail, highways and aviation sectors in the UK and beyond. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and on to Handsacre in Staffordshire.
Overall, we will be building the following across all our sites:
- 42 viaducts totalling over 11km
- 66 overbridges
- More than 35 cuttings reaching over 30km
- 56 culverts
- 66 embankments reaching over 33km
- Building four motorway crossings requiring box structures
- Six interfaces with the existing rail requiring both dive-under and overbridge structures
Diversity and Inclusion:
Balfour Beatty Vinci (BBV) is delivering equal opportunity for everyone that is part of the team and for people that are yet to join us. We are an inclusive employer and supportive of anyone with a physical or neuro-diverse ability. We welcome people from all backgrounds to come and join our team, including people with different physical abilities. We are transforming the image of construction through working on the HS2 project and increasing diverse representation of Balfour Beatty Vinci through representing the communities we are working in. We have embedded ED&I Champions across our sites and are guided by strong accreditations that ensure we demonstrate our ability to support our people effectively.
Flexible working:
Flexible or agile working is encouraged at BBV and we recognise the value and diversity of candidates which this can bring to our business operations. Not every role can provide a variety of working patterns to suit people's personal needs however we are happy to discuss agile working opportunities at BBV with you.
Disability confident:
We care about being inclusive and that means we encourage applications from people with diverse set of backgrounds and experiences. BBV is Disability Confident committed and we welcome applications from candidates with a disability.