Create, deliver and continually improve financial and contractual control of projects in order to achieve the Departmental and Corporate Objectives.
Utilise the existing business control procedures and engender/encourage improvements wherever practicable.
1. Having an in-depth knowledge of the department’s procedures, programme, and workload.
2. To be responsible for identifying further development potential.
3. To carry out condition surveys on listed buildings to get a better understanding of the level of repairs required, including recording defects with the understanding of proposed designs, cost implications and feasibility of repairs (elevations, roofs, windows, external walls, room data sheets, historic features, etc.).
4. To assist the Pre-construction Coordinator in advising on any queries from construction and commercial teams regarding repairs that may arise once soft stripping/demolition is carried out.
5. To assist the overall Pre-construction team with the production of drawings and reports, based on marked up plans and sketches.
Experience Required:
2. To have a basic, practical and demonstrable knowledge of Building Surveying, CAD and Construction practises.
3. To have a basic, practical and demonstrable knowledge of construction methodology.
4. To have a basic understanding of the various types of construction contracts.
5. To have an indepth understanding and appreciation of the importance of Health & Safety.
6. To be financially aware (cost management).
7. To be computer literate i.e. Word, Excel, Email, AutoCAD, Bluebeam.